PROJECTS FUNDED BY YOUR DONATIONS

 
 

    

 
CABIN 15                  
   

 

       
 

Cabin 15 is the furthest along in terms of our Basic Cabin Remodeling (BCR) Plan, and is projected to be finished by the end of November 2011. Pictured below is the cabin prior to siding removal.

 

aaaa

There are currently six cabins in various stages of the BCR plan. The goal is to remodel ten of Bluestone's fifteen cabins with volunteer support in three phases.

aaa
 
                       
BASIC CABIN REMODELING PLAN                

Phase One

  Replace the shingled roof and install ridge vent, ceiling insulation, and new heater units. The estimated expense for Phase One is about $3,500.00.
Phase Two   Remodel both bathrooms and install new PEX plumbing that will not freeze in the winter. The estimated expense for Phase Two is about $4,000.00.
Phase Three   Tear off the existing siding, insulate walls, replace windows, and reinstall new siding. The estimated expense for Phase Three is about $6,000.00. 
aaaaaaa aaaaaaaa aaaaaaa aaaaaaa aaaa aaaa aaaa aaa aaa aaa aaa CABINS 6 & 7             a

aa

aaaa

a a

a

a

Phase 2 was completed for Cabin 6 and started on Cabin 7 in the fall of 2010. These pictures show contrast between this phase finished and as a work in progress. iPhase 2 for Cabin 7 will be completed in 2012.

A Status Report from Bluestone's Camp Director concerning these and other projects funded by FoB can be viewed by clicking on the link to your right.

aa aa aa aa
  DONOR FUNDED PROJECT-EXPENSE REPORT
         
   
  PRESERVING OUR HERITAGE  -  GIVING BACK  -  ENABLING THE FUTURE
   
 

 

   
In Covenant Relationship with
 

As the mountains are round about Jerusalem, 

so the Lord is round about His people.

   
 

THE PRESBYTERY OF WEST VIRGINIA

       

bluestone.friends@gmail.com